| 2025 |
Six-laning of the Kagal- Satara section of NH-48, PKG-2, in the state of
Maharashtra, to be executed on BOT mode under BharatMala Pariyojana. |
Adani/DP Jain |
10,000 MTR |
| 2025 |
Construction of RS Walls for Pachora - Jamner GC Work and Extension up to
Bodwad in
Maharashtra. |
Ferro Concrete Construction (India) Pvt. Ltd. |
5,000 MTR |
| 2025 |
Construction of 4-Lane Elevated Corridor and at-grade improvements from
Design ch.-
0+000 to Design ch.- 19+870 of Danapur-Bihta section, including connectivity
to
existing ROB near Danapur station, ramps & carriageway upgradation to
Bihta-Koliwar
section (Total length- 25.081 km) in Bihar on EPC Mode. |
Ceigall India Ltd. – YFC Project Pvt. Ltd. JV |
5,000 MTR |
| 2024 |
Rehabilitation and Upgradation to Four lane configuration & Strengthening of
Thanpuri to Paror section from Km 85.135 to Km 100.840 of NH-20 (New NH-154)
(Length
16.275 KM) of Pathankot - Mandi under NH (O) in Himachal Pradesh on EPC
mode. |
M/s Universal Contractors & Engineers Pvt. Ltd. / Shree Riddhi Siddhi
Buildwell Ltd.
(JV) |
12,000 MTR |
| 2024 |
Four Laning of Tarsod-Fagne (Package-IIB) section of NH-6 from km.- 422.700
to km.-
510.000 in Maharashtra on Hybrid Annuity Mode under NHDP Phase -IV. |
Kalyan Toll Infrastructure Ltd. / AGROH Infrastructure Developers Pvt. Ltd.
|
9,000 MTR |
| 2024 |
Construction of Vehicular Underpass with Service Road at Km.- 176+787 (Khed
Railway
Station), Vehicular Underpass at Km.- 191+900 (Gunde Phata) and Vehicular
Over Pass
at Km.- 129+400 (Nadgaon village) on NH-66 in Raigad & Ratnagiri District,
Maharashtra. |
Kalyan Toll Infrastructure Ltd. |
4,500 MTR |
| 2024 |
Balance work of Four Laning of Panvel-Indapur section of NH-66 (Old NH-17)
from km.-
42.300 (KASU) to km.- 84.600 (Indapur) in Maharashtra under Bharatmala
Pariyojana.
|
- |
- |
| 2024 |
4-Lanning of Shahpur Bypass to Muktainagar section of NH-753L from design
ch.-
186.000 to design ch.- 216.278 in Madhya Pradesh on Hybrid Annuity Mode.
|
Muktainagar – Shahpur Corridor Pvt. Ltd. (BNA Infrastructure Pvt. Ltd.) |
12,000 MTR |
| 2024 |
Development of 4/6 Lane Access Control Expressway from Km.- 515.000 to Km.
528.300
(Kunjwani to Sidhra, NH-44) and Km. 550.900 to Km. 566.520 (Domel to Katra)
on
Hybrid Annuity Mode under Bharatmala Pariyojna in UT of J&K (Phase II -
Package
XVII). |
APCO Maa Vaishno Expressway Pvt. Ltd. |
10,000 MTR |
| 2024 |
Construction of 4-Lane Greenfield Jalbehra - Shahbad section of NH-152G from
Km.
0+000 to Km. 22+850 (Part of Shahbad - Thol Feeder Route) in Haryana on
Hybrid
Annuity Mode under Bharatmala Pariyojana Phase-I. |
Ceigall India Ltd. |
8,000 MTR |
| 2023 |
Widening and Strengthening for Improvement and Upgradation of NH-709A
Garhmukteshwar
(Chainage - 83+200 of NH-24) to Meerut (Chainage- 9+860 of NH-235) including
connector to NH-119 Package-XII in Uttar Pradesh. |
Tata Projects Ltd. |
10,000 MTR |
| 2023 |
Detailed Engineering Design for Construction of 4/6-Lane Access-Controlled
Expressway (Package-XIV) from junction near Balsua with NH-54 to junction
with
Hiranagar road near Gurha Baildaran (Km. 423+500 to Km. 468+100) of Delhi -
Amritsar
- Katra Expressway in Punjab and UT of J&K. |
Megha Engineering & Infrastructures Ltd. |
28,000 MTR |